- Product Categories
- Glass flake clay
- Glass flake vinyl clay
- Desulfurization tower corro..
- Glass Flake Coating
- NC beads machine
- Friendly Links
Information Name: | Glass flake epoxy clay | high temperature glass flake clay Price |
Published: | 2015-01-25 |
Validity: | 30999 |
Specifications: | Custom made |
Quantity: | 100000.00 |
Price Description: | |
Detailed Product Description: | Glass flake epoxy clay | high temperature glass flake clay construction 1.1.1 Price primer primer construction using roller or brush, always check the construction process, sagging, leakage and other phenomena painted with a roller or brush to catch pressed flat or up brush . 1.1.2 construction process test wet film thickness of less than 60Um site up brush. 1.1.3 material preparation: (1) preparation of the ratio: Paint: initiator: accelerator = 100: 1.5: 0.8 (weight ratio) (or according to the climatic conditions are adjusted) (2) Preparation method: first primer stirred with a mixer uniform, then add an initiator, curing agent were mixed by stirring for 1-2 minutes; (3) Professional Ingredients member and the recording material of the batch ingredients, dosage. 1.1.4 Operation points: (1) the way to roll back and forth first by scrolling up and down, uniform materials. (2) corner or roller brush difficult construction site. Wet film thickness test per 10m2 (3) not less than 5:00, the wet film thickness of less than 60um parts painted up. 1.1.5 climate controlled work area :( standard requirements) 1.2 Construction of the first layer of grass-roots flake lining 1.2.1 pre-construction checklist: You must use a dehumidifier dehumidifier high (1) when the humidity or condensation. (2) After brushing primer to confirm whether there is pink lining the surface layer or other foreign matter, such as attachment. If so, must be removed. 1.2.2 reconcile lining material (1) preparation of the ratio: Paint: initiator: accelerator = 100: 1.0: 0.5 (weight ratio) (or adjust according to climatic conditions) (2) to reconcile after sufficient stirring with a hand mixer . 1.2.3 lining construction essentials (1) using mud trowel and roller construction, to ensure that the average thickness and the expected requirements. (2) treatment with less roll dipped coated styrene gently rolling scales, trimming surface. (3) ensure that each wipe average wet film coating thickness control at 0.4-0.5 centimeters. 1.3 The first intermediate layer grassroots flake lining 1.3.1 visual inspection visual inspection, check to make sure no bubbling finger touch, injuries, signs of sagging, uneven, poor hardening and other defects. 1.3.2 The thickness of the check using a magnet or electromagnetic thickness gauge measuring a press 2m2 confirm lining thickness. 1.3.3 handling of failed at (1) the thickness of the shortcomings of the need to make up the thickness. (2) the protrusions, surface scars, sagging marks, bubbles in the premise of ensuring the thickness of polished with grinder. 1.4 The second layer grassroots flake lining construction (similar to those of the first layer) and so on, to ensure that the average per coat wet film thickness control at about 0.4-0.4 mm. 1.5 Surface Construction checklist 1.5.1 pre-construction |
Admin>>>
You are the 16354 visitor
Copyright © GuangDong ICP No. 10089450, Langfang four-star corrosion Material Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 16354 visitor
Copyright © GuangDong ICP No. 10089450, Langfang four-star corrosion Material Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility